OSHA EPA HUD & Lead

by | Apr 2, 2011 | Lead Safe Work Practices, Safe Practices | 0 comments

Reading Time: 3 minutes

OSHA

Oh boy is there ever a problem between the three of the federal agencies that regulate how lead is handled in the residential remodeling world. The EPA’s RRP rule came out last April and Levco has been all over it with training and lead safe work practices. I knew that OSHA was in existence, In fact we’ve visited and I have heard speakers from the organization on many safety issues related to workers falling or being crushed or killed. We even implemented a safety talk and keep first aid kits on the job. HUD and their rules are well established too and are similar to RRP but there are glaring inconsistencies both within them, and between them.

It wasn’t until I was attending my third RRP training and dealing with the national NARI work group helping to create a NARI position statement that the light went on. I was looking at a Linkedin conversation where an Oregon painting firm was being required to do air monitoring by OSHA among other things, and my thought was that they were being unfairly persecuted. They were following RRP and doing everything properly, why beat them up with additional requirements. Don’t theses agencies talk to one another?

HUD

DING. I called local OSHA and low and behold Jacob Ewer told me that there is a very specific procedure for Lead in Construction that has been on the books for years. The trouble is that no one in the residential remodeling world knows about it, or is following that rule. What is my excuse? I thought the OSHA lead rule was for industrial exposures and commercial work. I suppose it is best suited for that application, but it is clearly intended to protect all employees and we all need to be aware the rules. We simply have no choice but to follow.

Turns out that The big 3 government agencies are divided up into OSHA being responsible for workers safety, EPA is responsible for public health and environmental safety, and HUD is all about safe housing.

EPA

My goal is to reach out to OSHA and get their assistance with becoming compliant then educate my fellow contractors in the ways of OSHA. All the while working behind the scenes to eliminate confusing rules, and overlapping regulations that make my job more difficult than I believe it needs to be.

Fortunately, in communicating with the local OSHA group we are a federally regulated unlike our surrounding states. That being said we still require training on hazardous things like being up on a ladder and dealing with fall protection, the difference is we can teach each other. Lead rules are going to take some time to grasp a better understanding of our responsibilities. When it comes to mask fitting, dealing with air pumps and monitoring,  and all of the regulations that come with the Lead In Construction rule. If while monitoring air we reach the AL (Action Level) and or PEL (Permissible Exposure Limit) we must do medical monitoring including blood lead level. Those of you that thought the RRP rule was a hoot will love the fact that regardless of the amount of lead in a room, OSHA rules apply. My dream is that the big three can come together and devise one rule that makes sense and covers all issues related to property.

 

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

Have Your Tile Guys Gone Rogue? How do you know?

I just heard that there is a movement afoot that frightened me. I guess that tile guys are figuring out that they are not being watched so they are doing whatever they want. A nicer way of saying it is what they believe is the most profitable for themselves....

read more

Why Did You Hire Levco

The results are in, we have been asking this for years and we have been collecting data that I thought we should share some of it with you. You had the most enthusiasm for the project Your ideas seem to dovetail with ours You have a process that makes sense You always...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Categories

Latest Projects

Aged home interior makeover

Aged home interior makeover

Aged home interior makeoverThe Challenge This home was built in 1955 it had good bones. The kitchen had been remodeled by a previous owner and half of the garage had been converted into a den/laundry room. The clients wanted to open up the kitchen, add another...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge Our client bought the 1014 SF original 1979 ranch-style home next to her son. Her goal was to update and modernize the home to how we live today.The Idea To completely remodel and update the home with a new floorplan.The Solution Levco...

Wake Boat- RV Bay Addition

Wake Boat- RV Bay Addition

Wake Boat- RV Bay AdditionThe Challenge The Owner had a 3 car garage but the 3rd car bay was too small for his new wake boat. There was room to make it larger.The Idea Expand the garage to the setback to add 10′ and make it taller and much deeper. Sacrificing a window...

Large RV Garage From Scratch

Large RV Garage From Scratch

Large RV Garage From ScratchThe Challenge The Owner had drawings of a large RV garage to be added to a 2 car garage where a shed was. The new project was woven into an existing garage roofline to make it appear that it had always been there.The Idea Eliminate the shed...