Estimated reading time: 0 minutes, 41 seconds
The Challenge:
This was a 1963 Original guest bath; it had an out dated color scheme and some floor rotting issues from a poorly sealed toilet seal. There was minimal space between the tub and the cabinet to work with
The Idea:
To find a tub that was as narrow as possible and place the toilet at the minimum code clearance then let that set the width of the cabinet to meet code.
The Solution:
We cleared everything out and reinforced the floor. We re-plumed the bath and replaced every component. We located a remnant granite top and did the project quickly and efficiently. We also framed the mirror in the same material as the cabinet for a nice finishing touch
The Details:
Acrylic tub, comfort height toilet, medicine cabinet
Investment Range $11,000
Time Frame 3 weeks
Great post to share. There are many people who go through such problem sin their house. Thanks a lot for the right solution to this particular problem. In spite of the fact that a bathroom remodeling project can be stressful, millions of homeowners actually want and need to improve their living conditions.
Thanks Erin, remodeling is a challenging thing to do for others. We strive to make the experience an enjoyable one for everyone involved. The better we get the more likely we are to be referred to friends and family members. It is amazing to me how many folks are afraid to do it. Please sign up for my BLOG!