by Joe Levitch | Jun 12, 2013 | Bathroom Projects
The Challenge: The bathroom had been modified dramatically by the previous owner. The back bedroom had been converted into a bathroom by taking out a bathtub and opening up a wall. They had added a jetted soaker tub, but left an awkward set of doors and an unfriendly...
by Joe Levitch | Jun 12, 2013 | Bathroom Projects
The Challenge: The bathroom was original and had a series of complicating factors for the owners who now have new accessibility issues. The wheelchair was banging into the walls and the bathtub was too difficult to navigate with a helper. The original idea was to...
by Joe Levitch | Oct 12, 2012 | Bathroom Projects
The Challenge: This project was a modern home In Eagle, Idaho. The master bathroom had a functional design but outdated finishes. The bathroom was a work in progress when we arrived. The floor had already been removed and the toilet was leaking at the seal causing the...
by Joe Levitch | Nov 27, 2011 | Bathroom Projects
The Challenge: This was a 1936 home with one functional bathroom centered between the two bedrooms of the first floor. With a new baby on the way, a larger more efficient bathroom was necessary. There is still a potential master bathroom downstairs. The window was too...
by Joe Levitch | Nov 5, 2011 | Bathroom Projects
This was a 1965 home in Boise’s foothills that had a tight narrow space without enough natural light. It had a sunken shower and door separating the shower & toilet room from the vanity area. It had baseboard hydronic heat and carpeted floor. Another...
by Joe Levitch | Feb 22, 2011 | Basement Projects, Bathroom Projects
The Challenge: This was a basement storage area under the stairs and a perfect place to add a bathroom. determine what was under the floor. Finding a way to get the sewage out. It was a tight space and an enclosure would make it feel claustrophobic. Finding a way to...