Estimated reading time: 0 minutes, 33 seconds
The Challenge:

New Sun room
This is a home in an area near HP. They had a covered back porch that was sinking and wanted to enclose it .
The Idea:
Tear out the floor and install footings and stem walls. Reinstall floor joists and connect to the existing HVAC system.
The Solution:
We added two foundation walls and hacked the overhung roof back into position. We provide and install new windows and relocate the existing back door.
The Details:
DOW dura-ceramic floor without grout lines, operable windows. bead board. Colorful paint palate.
Investment Range: $12,000
Time Frame: 3 weeks
Recent Comments