Estimated reading time: 0 minutes, 42 seconds
The Challenge
This is a 1936 vintage home with original charm that was too tight and lacked a large enough closet. Enlarging the home was not an option.
The Idea
We wanted to create a larger master bedroom suite while still having a bathroom that was accessible to the first floor. The challenge was to maintain the integrity of the home within the original envelope and the feel of the artisan ship.
The Solution
We rearranged the typical bedroom bathroom bedroom to master bedroom walk through closet master bathroom with a second entrance.
The Details
Carrera marble vanity top, Double ended cast iron claw foot tub, heated tile floors, custom closet package, sconces in the mirror. Pocket doors, Central vacuum, and a laundry chute.
Investment Range: $50,000
Time Frame: 9 weeks
- the sketch
- The rough ins done
- The old bathroom
- The front bedroom before the project
- New Niche
- Laundry chute
- Hanging towels
- double vanity
- Closet pack
Recent Comments