I Know, Let’s Skip A Building Code Cycle

by | Jan 20, 2025 | Construction | 0 comments

Reading Time: 2 minutes

I have mocked the place I call home for 45 years, calling Idaho “The hold my beer watch this state,” This dates back to my EMS days. To be true to form, the state, in its infinite wisdom, has chosen or been forced to skip a 3-year building code cycle. The insanity of that and the repercussions are staggering. It makes no sense to me. But here we are using the 2018 IRC (International Residential Code) FFN (Forever For Now).

In Who’s Best Interest Is It?

2018 IRC forever for now

Hell, if I know? However, skipping the 2021 code cycle has to benefit somebody; otherwise, it would never happen. We have always been three years behind so that the bugs could be worked out, and I could digest that, but six years behind? Something is fishy here, and I want to know. For clarity, there is no mandate to have a three-year code cycle; it is just how it has always been done.

Why We Have a 3-Year Code Cycle:

  1. To stay up with the building industry’s best practices.
  2. To correct the past code cycle mistakes and inconsistencies.
  3. To add proper uses of new materials.
  4. To update our understanding of building science as it develops.
  5. To tighten and loosen rules based on life safety issues that have happened.

It’s time to dig in and figure it out. My hunch is that it is an organization that has some political clout.

Welcome To Idaho, Set Your Watch Back 10 Years

Isn’t that what the sign says as you pass into the Mountain Time Zone? It should. The silliness that happens here boggles the mind. Having hearings to take words carefully put into the codes to help contractors cross reference things has been removed in the name of reducing regulations. Huh? How does removing words equal reducing regulations? I participated for a bit to stem the tide of the loss of connectivity, but I backed off when it was clear that my input was not welcome.  Some legislators got a pat on the back, and a politician got to take credit for reducing regulations.

Here is the 411

The truth is that while they were working on the 2021 code cycle adoption, they peeked at the 2024 code cycle, which is reportedly less restrictive, especially regarding the energy code. So, those new home builders convinced the party in power to skip the normal progression of the code cycle. Wait, what if we get to the following code cycle in 2027, and it looks like the next one is even less restrictive? Do we skip 2024? Time will tell. As a building professional, I want to use the latest and greatest code cycle. IMHO, being behind three years for working out the bugs makes sense. Being behind six or more is foolish.


Your comments are welcome. To ask questions or get more information about remodeling, click here to email me directly, or call 208-947-7261

If you or someone you know is considering remodeling or just wants to speak to a trustworthy remodeling contractor, please contact me. You’ll be glad you did.

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

We See A 20 Year Cycle

We See A 20 Year Cycle

We are beginning to see a growing number of homes built in 2004 ready for remodeling, which is common in 20-year cycles. I recall with some vivid imagery my evolutions in thought and life situations over each 20-year chunk of my life. So goes the evolution of your...

read more
My New Hokey Pokey At 66

My New Hokey Pokey At 66

As I age and grow into myself, now 66, I develop a different perspective on life and my Hokey Pokey. Naturally, as we've all learned, that's what it's all about at a tender age. As slowly as the moon slips through the night sky, I sense a palpable change. Though I...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Categories

Latest Projects

Master Suite Addition

Master Suite Addition

Master Suite AdditionThe Challenge They came up with a plan drawn by others with several significant errors. One was the size of the addition, and the other was the angle of the trusses. The clients who work remotely turned out to be excellent communicators and...

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen RemodelThe Challenge The home had an odd entry room with a coat closet and partition wall in the way. This room was pretty useless and annoying to the client. Then, the kitchen was blocked from the activity in the living room, and the...

Primary Suite Remodel with Deck

Primary Suite Remodel with Deck

Primary Suite Remodel & DeckThe Challenge Inaccurate plans were provided that had to get updated over the course of the project. The project is on a creek so lots of precautions were needed to keep erosion out of it.  The Idea Create a primary suite that is...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge The home was in the hillside district and in the WUI which means that the home has some extra requirements as far as firesafe and extra structural requirements. There had been an addition done to the house years prior that was not...