Aged home interior makeover

by | Jan 2, 2015 | Uncategorized | 0 comments

Reading Time: < 1 minute

The Challenge:

Remodeled front room

Remodeled front room

This home was built in 1955 it had good bones. The kitchen had been remodeled by a previous owner and half of the garage had been converted into a den/laundry room. The clients wanted to open up the kitchen, add another bathroom, and make the home flow better.

The Idea:

reshape the kitchen, remove a Bearing wall and open the kitchen to the living room. Create a new bathroom in the laundry room and replace the clogged galvanized pipes with PEX pipes. Relocate hallway entry to obscure view into the bedroom, relocated the water heater from a closet, add natural GAS to a stove and water heater,

The Solution:

We settled on a great L-shaped kitchen and concrete counter tops, we removed a bearing wall and created a seating spot. We inserted the refrigerator into the hall to block it off and added a cabinet in the other hall. We rearranged the front room and refinished all of the floors. We added a bathroom in the laundry room.

The Details:

Recessed puck lighting, concrete counter tops, barn door, curbless shower, new gas water heater, PEX pipe replacement, reclaimed lumber stair into den,

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

My New Hokey Pokey At 66

My New Hokey Pokey At 66

As I age and grow into myself, now 66, I develop a different perspective on life and my Hokey Pokey. Naturally, as we've all learned, that's what it's all about at a tender age. As slowly as the moon slips through the night sky, I sense a palpable change. Though I...

read more
Holy Cow! We Do Amazing Work

Holy Cow! We Do Amazing Work

As a business owner, doing all the behind-the-scenes things is often so time-consuming that I honestly "Don't get out much." It took a friendly reminder, and now I have a scheduled tour de force every Wednesday with my Construction Manager. We ride around and look at...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Categories

Latest Projects

Master Suite Addition

Master Suite Addition

Master Suite AdditionThe Challenge They came up with a plan drawn by others with several significant errors. One was the size of the addition, and the other was the angle of the trusses. The clients who work remotely turned out to be excellent communicators and...

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen RemodelThe Challenge The home had an odd entry room with a coat closet and partition wall in the way. This room was pretty useless and annoying to the client. Then, the kitchen was blocked from the activity in the living room, and the...

Primary Suite Remodel with Deck

Primary Suite Remodel with Deck

Primary Suite Remodel & DeckThe Challenge Inaccurate plans were provided that had to get updated over the course of the project. The project is on a creek so lots of precautions were needed to keep erosion out of it.  The Idea Create a primary suite that is...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge The home was in the hillside district and in the WUI which means that the home has some extra requirements as far as firesafe and extra structural requirements. There had been an addition done to the house years prior that was not...