Kitchen Water Damage Repair

by | Jan 19, 2011 | Insurance Restoration & Claims | 0 comments

Reading Time: < 1 minute

The Challenge:

This is a home where the owners noticed some hardwood floor cupping on a Friday and called to set an appointment for Monday at 3pm. Upon our arrival the owners had heard a loud snap and greeted us at the door.

The Idea:

On removal of counter tops and cabinetry, the owners decided to upgrade from laminate to granite, and replace their sink too.

The Details:

We tore into the flooring and cabinetry to find the problem and had it fixed within a few minutes. Turns out a refrigerator water line fractured and sprung a leak.

The Solution:

The owners decided to upgrade from laminate to granite, and replace their sink to just to get the fridge out and stop the leak. Cleanup and repairs were extensive however, the result are stunning. We assisted the owners with material selections and were able to keep a temporary kitchen operational. I even took them to dinner the night their floors were being sealed.

The Time Frame: 7 weeks

 

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

Have Your Tile Guys Gone Rogue? How do you know?

I just heard that there is a movement afoot that frightened me. I guess that tile guys are figuring out that they are not being watched so they are doing whatever they want. A nicer way of saying it is what they believe is the most profitable for themselves....

read more

Why Did You Hire Levco

The results are in, we have been asking this for years and we have been collecting data that I thought we should share some of it with you. You had the most enthusiasm for the project Your ideas seem to dovetail with ours You have a process that makes sense You always...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Categories

Latest Projects

Aged home interior makeover

Aged home interior makeover

Aged home interior makeoverThe Challenge This home was built in 1955 it had good bones. The kitchen had been remodeled by a previous owner and half of the garage had been converted into a den/laundry room. The clients wanted to open up the kitchen, add another...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge Our client bought the 1014 SF original 1979 ranch-style home next to her son. Her goal was to update and modernize the home to how we live today.The Idea To completely remodel and update the home with a new floorplan.The Solution Levco...

Wake Boat- RV Bay Addition

Wake Boat- RV Bay Addition

Wake Boat- RV Bay AdditionThe Challenge The Owner had a 3 car garage but the 3rd car bay was too small for his new wake boat. There was room to make it larger.The Idea Expand the garage to the setback to add 10′ and make it taller and much deeper. Sacrificing a window...

Large RV Garage From Scratch

Large RV Garage From Scratch

Large RV Garage From ScratchThe Challenge The Owner had drawings of a large RV garage to be added to a 2 car garage where a shed was. The new project was woven into an existing garage roofline to make it appear that it had always been there.The Idea Eliminate the shed...