New Safety Information

by | Aug 24, 2012 | News | 0 comments

Reading Time: < 1 minute

From The front Page

-Date Line Boise Idaho 7-15-2012

NARI

Joe Levitch was allowed to expand his role as lead based paint committee chair for NARI to include Safety. “Safety is a subject that is near and dear to his heart”. said Joe a life long EMS participant. The first topical item to discuss is heat related issues. Documents related to Safety along with Lead based paint and RRP will soon be available to all of our members to improve the value of a NARI membership.

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

What Makes This Entrepreneur Tick

What Makes This Entrepreneur Tick

As a kid, my older brother Mike was known for putting things apart and putting them back together. He went on to become an accomplished locksmith and then a hardware specialist for large commercial projects. He pioneered a lock that retrieves stolen keys for the local...

read more
I’ve Got My Son Back

I’ve Got My Son Back

I dropped in on a remodeling client to ensure she was as excited about the progress as I was. Standing there with a tear in her eye, she uttered these powerful words. The reason for the remodel is to expand her home to enable her son, who is living with her, to have...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Categories

Latest Projects

Master Suite Addition

Master Suite Addition

Master Suite AdditionThe Challenge They came up with a plan drawn by others with several significant errors. One was the size of the addition, and the other was the angle of the trusses. The clients who work remotely turned out to be excellent communicators and...

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen RemodelThe Challenge The home had an odd entry room with a coat closet and partition wall in the way. This room was pretty useless and annoying to the client. Then, the kitchen was blocked from the activity in the living room, and the...

Primary Suite Remodel with Deck

Primary Suite Remodel with Deck

Primary Suite Remodel & DeckThe Challenge Inaccurate plans were provided that had to get updated over the course of the project. The project is on a creek so lots of precautions were needed to keep erosion out of it.  The Idea Create a primary suite that is...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge The home was in the hillside district and in the WUI which means that the home has some extra requirements as far as firesafe and extra structural requirements. There had been an addition done to the house years prior that was not...