Lead Testing Phase

by | Feb 4, 2011 | Lead Safe Work Practices, Levco Builders Process | 1 comment

Reading Time: 2 minutes
Lead Paint

Lead Paint

As many of you are aware, The EPA made April 22nd, 2011 (Earth Day) the start of the RRP rule a program that mandates that all homes built prior to 1978 shall be considered leaded until tested otherwise. This in turn inspired Levco Builders to invest in additional training of employees and the purchase of two Innov-x XRF analyzers.

Lead Locators was born. Lead Locators was contacted by the Owner to test the project in anticipation of remodeling the home. The test found a heavily leaded home primarily on the exterior which was not uncommon. Lead based paint was often used as an exterior coating because of its ease of application, colorfast properties and longevity.

Leaded Window Frame

Leaded Window Frame

The RRP rule mandates that properly trained individuals conduct disturbing of lead based paint with the overall coal of dust free demolition and involves extensive steps to protect owners occupants the environment and employees.

The report essentially saved money in the long run because much of the home was not leaded therefore traditional demolition techniques were able to be employed on much of the renovation.

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

Building Science and Remodeling

Building Science and Remodeling

As a residential remodeler for a few decades after being a paramedic for a little longer,  I have learned to take command of a situation and solve problems quickly and efficiently. I have been able to watch the evolution of Building Science. It affects every aspect of...

read more
What Makes This Entrepreneur Tick

What Makes This Entrepreneur Tick

As a kid, my older brother Mike was known for putting things apart and putting them back together. He went on to become an accomplished locksmith and then a hardware specialist for large commercial projects. He pioneered a lock that retrieves stolen keys for the local...

read more

Leave A Comment

1 Comment

  1. Bob and Robin

    >Nice job, Joe. Looks like you have it!

    Reply

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Categories

Latest Projects

Master Suite Addition

Master Suite Addition

Master Suite AdditionThe Challenge They came up with a plan drawn by others with several significant errors. One was the size of the addition, and the other was the angle of the trusses. The clients who work remotely turned out to be excellent communicators and...

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen RemodelThe Challenge The home had an odd entry room with a coat closet and partition wall in the way. This room was pretty useless and annoying to the client. Then, the kitchen was blocked from the activity in the living room, and the...

Primary Suite Remodel with Deck

Primary Suite Remodel with Deck

Primary Suite Remodel & DeckThe Challenge Inaccurate plans were provided that had to get updated over the course of the project. The project is on a creek so lots of precautions were needed to keep erosion out of it.  The Idea Create a primary suite that is...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge The home was in the hillside district and in the WUI which means that the home has some extra requirements as far as firesafe and extra structural requirements. There had been an addition done to the house years prior that was not...