Design Build Vs. Handyman remodeling

by | May 3, 2011 | Levco Builders Process, The Law | 0 comments

Reading Time: 3 minutes

At Levco We have structured the business into a Design Build Model that works differently than the handyman model.

Our work is geared to the homeowner that wants a project completed ranging from the $8000 to $250,000. So far our clients have not come to us with a complete description of work that is ready to build. There is always some sort of clarity that needs to be spelled out.

The larger the scope of the project, the more time involved in creating the needed documentation.

A handyman is likely a jack of all trades

There are plenty of carpenters that go out on their own and are essentially a handyman in disguise. Hiring one for a project for longer than a few hours will likely include then into your life. My general rule of thumb is that like programs that offer you too many features, they are likely not as good as a great general contractor to run the project with a crew of their own.

The Levco Process

At Levco get great results by separating the process of having a remodeling project done into the Design Phase (AKA pre-construction documentation), and the Construction Phase and we have an agreement for each. I prefer and use the word “agreement” rather than “contract” because it conveys the sentiment that I attach to it. A mutual understanding of the duties and responsibilities of both parties. The reality is that the words could be used interchangeably.

Design Phase:

During this phase we collect a non-refundable Design development fee that covers our time to create the proper drawings and documentation to clearly communicate just exactly what you want.

This fee is based upon my estimation of hours required to develop schematic drawings, and have all of the subcontractor bids collected once your select your materials and component to be incorporated. The goal is to reach an accurate Contract Amount through the process of estimating efficiently and systematically with all the information we need.

Construction Phase

Construction Phase:

This is a comprehensive agreement that looks at all of the aspects of construction and spells out the legal obligations of the project and all of both parties. It also references the design agreement for all of the technical data. In the agreement you will find everything from change orders and how we deal with excavated soil to payment schedules, legal disclosures, and dispute resolution.

The days of a hand shake contract are gone

I recently had a client that was frightened by the Construction Agreement and admitted that he had several remodeling projects done without and agreement. In my opinion, those days are gone, An agreement is the only way to have an “exact same understanding” of each parties responsibilities. I not do work without one.

I would be suspect of those contractors without a clear and conscience remodeling agreement. In Boise Idaho, all you need to do is spend a day in court listing to all of the sob stories about misunderstandings. That is not to say that our agreement is perfect, every project is slightly different so our agreements are updated regularly.

Several  past clients have been attorneys who have graciously provided insightful modifications. Many of the updates were earned out of hard lessons learned, thankfully it has been stable for the past few years.

I am always proud to present our agreements for review and signing because it conveys a sense of “I’ve got it” to my clients.


If this process sounds like something that interests you contact us today at 208-947-7261 You’ll be glad you did.

 

Disclaimer: Some of these images came from the WEB. If they are yours, and you object to them being used, please claim them and I will gladly remove and replace them at once.

Related Posts

Building Science and Remodeling

Building Science and Remodeling

As a residential remodeler for a few decades after being a paramedic for a little longer,  I have learned to take command of a situation and solve problems quickly and efficiently. I have been able to watch the evolution of Building Science. It affects every aspect of...

read more
What Makes This Entrepreneur Tick

What Makes This Entrepreneur Tick

As a kid, my older brother Mike was known for putting things apart and putting them back together. He went on to become an accomplished locksmith and then a hardware specialist for large commercial projects. He pioneered a lock that retrieves stolen keys for the local...

read more

Leave A Comment

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Categories

Latest Projects

Master Suite Addition

Master Suite Addition

Master Suite AdditionThe Challenge They came up with a plan drawn by others with several significant errors. One was the size of the addition, and the other was the angle of the trusses. The clients who work remotely turned out to be excellent communicators and...

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen Remodel

Dining Room Addition and Kitchen RemodelThe Challenge The home had an odd entry room with a coat closet and partition wall in the way. This room was pretty useless and annoying to the client. Then, the kitchen was blocked from the activity in the living room, and the...

Primary Suite Remodel with Deck

Primary Suite Remodel with Deck

Primary Suite Remodel & DeckThe Challenge Inaccurate plans were provided that had to get updated over the course of the project. The project is on a creek so lots of precautions were needed to keep erosion out of it.  The Idea Create a primary suite that is...

Whole House Remodel

Whole House Remodel

Whole House RemodelThe Challenge The home was in the hillside district and in the WUI which means that the home has some extra requirements as far as firesafe and extra structural requirements. There had been an addition done to the house years prior that was not...